On the 10th-12th of November, the switchboard at the hospital in Egersund, Norway was scheduled to be replaced. The switchboard was installed when the hospital was built in the early 1970s, so it was time for an upgrade. This posed a challenge for the hospital, which would have been without power for long periods, which is not optimal for a hospital. To ensure that patients and staff had access to power, we provided a temporary back-up solution.

The main switchboard at the hospital was built to the standard of the time, and could be dangerous to touch, which meant that the hospital’s operating personnel could not access the room without an electrician following them. In the summer, a power failure occurred and a serious fault was discovered in the main switch. Following a safety analysis and measures were taken to ensure that the main switch could not be operated during the next power failure, and a new main switchboard was ordered.

Once the planning and risk analysis was completed, a precise schedule and resource plan was created to ensure operations and power supply throughout the replacement. To avoid downtime, they contacted us at Pon Energy Rental for a temporary power solution. For the actual replacement, the area was rigged with power from our 500kVA generator. On November 12, the work to replace the board was completed and the temporary power solution was disconnected.

About this project

  • Back-up power
  • Power for hospital
  • Critical facilities 

Our solutions come with a wide range of standard services

24/7

support

Remote

monitoring

Transport

(delivery on site)

How can we help you?

Start a conversation with one of our experts

You’re very welcome to share your energy challenge with us so we can understand what you’re looking to achieve. Our experts will offer you advice and together we’ll create the right solution for your needs.

Get in contact